-- Projects --

Projects undertaken over the last few years have included the following:
Ludowici ( Malco Engineering )

Dampier Salt Stacker

Geoff Dyer and Associates have undertaken a computer modelling and analysis of an existing Salt Stacker near Carnarvon in WA, to consider its compliance with current design codes including AS4324.1 - Mobile equipment for handling of bulk materials.  Further work has included a site assessment of corrosion and reporting of strengthening requirements.

Recent projects have included:

  • Siam Seaport Telescopic chute support structure including Shiploader boom extension
  • Other Materials Handling equipment structural design
Dampier Salt Stacker

Radial Salt Stacker
Click for enlargement


Unimin

Port Pareham Shellgrit Plant

  • Shellgrit Plant layout
  • Structural design and drafting of a new bin structure
  • Conveyor for feeding and storage of raw materials
  • Silo modifications and foundations
Recent projects at this site have included:
  • Cyclone and Fan Support Structure
  • Drier Support Structure
  • Outloading conveyor support structure, platform and canopy
  • Dust Collector Support Structure & Footing

Glenshera Sand Plant (Mount Compass)

Previous work undertaken has included Sand Mining-Conveyors, Drier support and associated structures.

Recent projects at this site have included:

  • Extensions to Sand Drying Plant - Mechanical and structural layout
  • Sand Storage Bin, Support Structure and Foundation design
  • New Stockpile Tower footing and upgrade of standard tower design
  • Repair recommendations for existing stockpile towers
Tantanoola Quarry – Crusher Foundation

WMC – Western Mining, Olympic Dam

Extensive involvement over a number of years has included:

  • Standard Conveyor & Trestle design
  • Conveyor Trusses & Trestle Foundations
  • 1000t Bin Finite Element Analysis for eccentric loading
  • Pipe Racks & Support Structures
  • SO2 Duct Stress Analysis
  • Overhead Traveling Crane Design & Verification
  • Refinery Building Extension
  • Corrosion Reporting & Repair recommendations

Previous word undertaken for WMC has included:

  • Ball Mill Foundation
  • 1000t Bin design
  • Whenan Shaft Headframe modifications
  • Building structures
  • Chimney Stack and Support Structures

Recent projects have included:

  • Contract work on Smelter shutdown with Werley ODA alliance
  • Contract work on site with MPR Services Pty Ltd for various projects
Whenan Headshaft

Whenan Headshaft
Click for enlargement

 

WMC Duct Structures

WMC Duct Structures
Click for enlargement 


Orlando Wyndam, Barossa Valley, SA

Recent projects have included large tank farm extensions consisting of 36 x 680kL tanks at Richmond Grove and 60 x 680kL tanks at Rowland Flat, as well as smaller tank farm extensions at both sites. The scope of engineering included reinforced concrete slabs, pipe bridges and supports, walkways and stair access, retaining walls, drainage and associated civil works and design and verification of tank designs. The use of steel fibre reinforced slabs using Dramix/Scancem fibres has proved to be successful and cost efficient for the smaller projects.

Winery Storage Tanks

Winery Storage Tanks
Click for enlargement

Brister & Co.

Stainless steel tanks – design and detail drafting for various projects.

Other tanks have been designed for Amec Engineering, Western Mining / Olympic Dam, Iona International and International Engineering.

reactor_tank_thumb.gif (3909 bytes)

Jacketed Reactor Tank
Click for enlargement

Western Mining, Olympic Dam – Mine

Underground load chute support structure including steelwork design and drafting, designed to support chute and to withstand large impact loads from falling ore.
Concrete arch load chute structure, including Finite Element Analysis (FEA), as an alternative structure to the steelwork designs currently in operation.
Modifications to the underground crushing plant structure
Bypass chute to Clark Shaft ore bin.

 

concrete_arch_thumb.gif (9263 bytes)

Concrete Arch - Isometric View
Click for enlargement


Malco Engineering (Ludowici)

Millmerran Power Station, Queensland – Structural engineering design of traveling stacker and tripper, and portal reclaimer (refer to view on Software page of this brochure).
Other similar work has included the structural design of stackers and attached tripper structures for Moranbah coal, Queensland and for Western Collieries, WA.

moranbah_coalstacker_thumb.jpg (6740 bytes)

Moranbah raw coal stacker
Click for enlargement


ABC – Adelaide Brighton Cement (Limited)

Shiploader additions and repairs.
An ongoing role with inspections of the shiploader, especially at times of damage or abnormal loading. Previously involved with additions and upgrades to the structure and adjacent conveyors.

Previous work undertaken for Adelaide Brighton Management has included bins and hoppers, conveyors galleries and transfer towers, and feasibility studies for various projects.

ABC Bins

ABC Bins
Click for enlargement


David Hanman Engineering Services, Thailand

Use of M.S. Tower software (by Engineering Systems, Australia) for the following projects:

  • Triangular Lattices Towers of up to 62m
  • 59m 4 legged Lattice Tower in Brunei
  • Tender bid for 152m tower in Pakistan
  • Design check and upgrading of an 81m guyed tower for increased loadings

Blue Circle Southern Cement, Lime Plant - Galong / Marulan

  • Mill No.4 Building mechanical, structural and civil design, drafting and shop detailing of building to house Mill, Surge Hopper, Dust Collector, Cyclone, Fans, Drag Conveyor and Bucket Elevator.

Special aspects have included computer modeling using the latest Microstran 8 analysis and design software, and dynamic analysis of foundation for 70 tonne mill.


Combined Resources Engineering (CRE)
  • Ridgeway Gold Mine – design and drafting of structural and civil works for fan installation to underground mine, including fan foundations, automatic ventilation doors and walls, and fan bulkhead wall.
  • Pasminco, Broken Hill Mine – sheave support structure including for impact load protection.
  • Peak Gold Mine – conveyor tramp magnet & chute.

Continental Conveyors
Audit of conveyor structures for the Century Zinc Project in Queensland, including a luffing, barge-loading conveyor.

Allied Engineering
  • Tram support structure for TransAdelaide
  • Structural design of camera and antenna supports for Chubb Security
Recent projects for this client have included Roof Access to Adchem Building, Burra.

Flow Force Technologies
  • Bulker Bag Weighing Machine
  • Load Cell Weighing Machine

ABC Shed & Structure

ABC Shed and Structure
Click for enlargement
WMC 1000t Bin & Conveyors

WMC 1000t Bin & Conveyors
Click for enlargement

Geoff Dyer and Associates Website
Consulting Structural Engineers